We will size the power for your equipment, deliver and connect the generator with automatic start. Standby and prime power supply, from calculation to service.
Generator panel: controller on top, ATS unit below
Arrives ready to start
An enclosed generator already has all the essentials installed; nothing else to buy.
ATS: the generator starts automatically when mains power fails and shuts down when it returns
All-weather soundproof canopy with enhanced sound insulation
Coolant heater for winter starting. Available on most models; see the product page for details
Two batteries with automatic charging
Oil and antifreeze filled
What is inside the generator
Yuchai 100 kW, built from photos of this actual unit in our warehouse. Click a hotspot or select a component, and the canopy door opens with a photo of the part.
Click the door to look inside, or a hotspot to learn about a component
Loading 3D model…
From the factory nameplate
Power
100 kW
Voltage
400 V, 3-phase
Frequency
50 Hz
Speed
1500 rpm
Dimensions
2860 × 1100 × 1460 mm
Unit components
Photo: this unit in our Almaty warehouse
How ordering works
1
We calculate power
Based on your equipment list or incoming current. We account for starting currents of pumps and compressors.
2
We send a quotation
Model, design, scope of supply and lead time. We can compare it line by line with another supplier's quote if you have one.
3
We deliver
Delivery across Kazakhstan. The generator arrives with oil, antifreeze and batteries.
4
We install and commission
Connection to the panel, ATS setup, commissioning.
5
We provide service
Warranty and scheduled maintenance by engine hours.
Factory assembly
Finished generators
Loading
Crane unloading
Delivery to site
On site
Generator cable
We will calculate the cable to the panel together with the generator
Cross-section based on your model's current, copper or aluminium, length and lugs. Select the power:
kW is active power, the power that actually runs your equipment. kVA is apparent power. For generators they are related by a factor of 0.8: 100 kW equals 125 kVA. If another supplier's quote says "125 kVA" and ours says "100 kW", it is the same power.
What are rated and maximum power?
A generator can run at rated power for long periods (PRP mode). Maximum power is sustained only briefly and is about 10% higher; this is standby mode (ESP). Size the generator by rated power with a margin.
What is an ATS and why do you need it?
ATS stands for automatic transfer switch. When mains power fails, it starts the generator automatically and transfers the load to it within seconds. When mains power returns, it switches back and shuts the generator down. Enclosed generators come with an ATS installed; for open-frame units it is available at extra cost.
Enclosed or open-frame generator?
An enclosed generator is installed outdoors: the all-weather canopy protects against precipitation and reduces noise to 65–70 dB. An open-frame unit sits on an open skid and is installed indoors or in a container. It is cheaper, but louder.
What is the warranty?
The Yuchai line has a warranty of 2 years or 1500 engine hours, Weifang and Shanghai 1 year or 1000 engine hours, whichever comes first. An engine hour is one hour of actual engine operation on the hour meter.
How much fuel does a generator use?
It depends on the load. Each model page lists consumption in liters per hour at 50, 75 and 100% load. For example, the Yuchai 100 kW uses 22 L/h at full load.
Do you deliver across Kazakhstan?
Yes. Our office is in Almaty; we deliver throughout Kazakhstan and install and commission on site.
Not sure what power you need?
Send us your equipment list or a photo of your electrical panel. We will calculate and reply with the model, scope of supply and cable cross-section.